Lightning protection grounding construction process

March 18 , 2024

Jinli is a company integrating R&D, production, and sales. Since its establishment in 2006, it has 18 years of experience producing surge protectors. The lightning protection department consists of a technical department and a construction department. Among them, there are 10 technicians and 20 construction workers. Mainly responsible for lightning protection and grounding construction projects, and is deeply supported and trusted by customers.


The construction process is as follows:
1. Construction preparation. The required materials and tools must be prepared before construction, including grounding electrodes, grounding wires, resistance-reducing agents, flat steel, etc. At the same time, the safety of the construction site must be ensured and the location of the grounding wire must be determined. The grounding electrode shall be as required on the drawing.
2. Production of ground electrodes. The ground electrode is made according to the design requirements, usually using galvanized angle steel or round steel, and the length is generally 2.5m. When making, make sure one end of the angle steel is driven into the ground and the other end is connected to the ground wire.
3. Install the ground wire. Ground wires are usually made of galvanized flat or round steel. During installation, ensure a firm connection with the grounding pole and maintain a certain bending radius to prevent mechanical damage. At the same time, ensure that the grounding wire is fixed in a reasonable position to avoid external influence during operation.
4. Lay resistance-reducing agent. Laying resistance reducing agent around the grounding electrode can reduce the grounding resistance and improve the lightning protection effect. When laying, the amount of resistance-reducing agent should be determined according to the soil conditions, and good contact with the ground electrode should be ensured.
5. Connection test. After completing the above steps, a connection test needs to be performed to check whether the grounding resistance meets the requirements. If the resistance value does not meet the requirements, it is necessary to further adjust the amount of resistance-reducing agent or increase the number of grounding electrodes.

6. Things to note. Construction safety must be ensured during the construction process to avoid electric shock accidents. At the same time, construction must be carried out in strict accordance with the design drawings and construction specifications to ensure that the construction quality meets the requirements. In addition, attention should be paid to protecting the environment during the construction process to avoid adverse effects on the surrounding environment.

Jinli ac spd

Jinli spd has CE, IEC, UL, German TUV, and other international certifications.
The product ranges from raw material incoming inspection to process inspection during the production process to voltage and current performance inspection of the finished product. Every link is tested at all levels to control the performance and quality of the product. Committed to making lightning protection products the best.
Leave A Message
Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

skype

whatsapp